YERI INTEGRATED SELF-FINANCING RURAL DEVELOPMENT PROJECT

"NEW HORIZONS FOR YERI"

MVOLO COUNTY, SOUTH SUDAN

A HUMANITARIAN RELIEF PROJECT INCORPORATING LETS AND COMMUNITY BANKING

PREPARED FOR THE NGO "SUDAN INLAND DEVELOPMENT FOUNDATION (SIDF)", MVOLO, SOUTH SUDAN

BY

YOWANI NGOLI, OF YERI, SOUTH SUDAN

AND

T.E.MANNING, CONSULTANT, WIERINGERWERF, THE NETHERLANDS


Edition 02: 23 July 2003

EXECUTIVE SUMMARY OF PROPOSED  INTEREST-FREE LOAN FINANCED PROJECT

01. INTRODUCTION

The accompanying Integrated Self-financing Development Project for Yeri and surrounding areas in Mvolo County in Southern Sudan covers a complete package of basic services for sustainable development in the beneficiary communities. It includes hygiene education, the provision of drinking water and sanitation services, PV lighting for study, PV lighting and refrigeration in clinics, waste removal, high-efficiency stoves and bio-mass to fuel them. It provides a strong thrust for on-going local development, productivity, and employment. It contains many decentralised solar energy applications.

It also includes as a separate tranche an emergency project for the eradication of Onchocerciasis (River Blindness) in Mvolo County itself. This disease has assumed disastrous proportions in Mvolo with 25% (120.000 victims) of the population in the County infected. Many have already become blind, including 300 in the Yeri project area alone.

The project is strongly demand response oriented. It has been worked out together with the people concerned, who will execute, run, own and pay for it.

The project provides practical working solutions for sustainable integrated development in the Yeri area and covers all major development priorities. It constitutes a practical way of applying modern development concepts such as those outlined in the DFID "Guidance manual on water supply and sanitation programmes" (WEDC for DFID, 1998). It integrates in a practical and feasible manner policy, finance, technology and human capacity building to offer sustainable solutions to development

The project application is self-financing, subject to an interest-free seed loan repayable in 10 years. It is structured for about 7500 households (46700 users). The amount of the loan is Euro 3.500.000 or approximately Euro 70 per user. This is repaid by a monthly payment of Euro 0,70 per user into a Cooperative Development Fund. This is enough to cover the basic package offered.

The project requires 95% financing by an External Support Agency within the framework of a  programme with a donor partner. Regional or state authorities in South Sudan are expected to supply the remaining 5%.

The project  allows the recipient communities to fully exploit a network of sustainable development activities using:
(i) The interest-free loan itself
(ii) Local Exchange Trading Systems (LETS)
(iii) Multiple re-cycled interest-free micro-credits to be administered by a local bank. They are generated by recycling loan repayments and reserves during the loan term.

The communities pay the seed money back into a cooperative development fund which is repeatedly recycled interest-free over a ten year period, when the seed money is repaid.

02. THE MAIN PROJECT PACKAGE

The project is centered on the following main components:

A. The emergency onchocerciasis eradication project. This is based on the following approach:
1.Action to limit the breeding of the black-fly along the Naam river
2.Avoiding the need to fetch water from the Naam river.
3.Action to cure existing infections so as to avoid further cases of blindness
4.Means of transport for the Onchocerciarsis eradication project
5.Means of communication for the Onchocerciarsis eradication project
6.Reintegration of the blind into the community

B. Integrated self-financing development

01.Hygiene education at community level (Health Clubs)
02.Distributed clean drinking water (solar pumps with handpumps backup)
03.Sustainable sanitation (based on the separation of urine, faeces, grey water, other organic waste)
04.Supply of efficient stoves for cooking (plus solar cookers)
05.Production of biomass to fuel the cookers
06.Recycling of non-organic waste products (rubbish collection)
07.PV lighting for study
08.PV lighting and vaccine refrigeration in clinics
09.Rainwater harvesting
10 A local high frequency radio network for communications

03. GENERAL ECONOMIC BASES OF THE PROJECT

a)The project will be financed by interest-free seed capital in the form of a 'green' loan repayable over a period of 10 years. The special tranche for Onchocerciasis will be financed separately by way of grant.

b)95% of this capital will be contributed by a external support organisation recognising the urgent humanitarian nature of this project, and the remaining 5% by the Mvolo County Council and/or the Government of Southern Sudan.

c)General financial supervision will be in line with section 2.14 of this project, on terms agreed with the lenders of the seed capital, but with the elimination of unnecessary bureaucratic restraints.

d)Seed capital repaid by users in monthly instalments will be retained in the local area until the end of the loan term. During that time, the repayments will be used to grant revolving interest-free micro-credits for local development.

e)Seed capital not required for short term use, will similarly be used to grant interest-free revolving micro-credits.

f)Local currency (LETS) systems set up within the framework of the project will form the general method of payment for most local goods and services produced at community level, including those provided for the project from within the local community.

g)The part of the maintenance money destined for long term replacement of capital items will also be recycled as interest-free micro loans until it is needed for the project.

h)Users will be 100% responsible for on-going administration, capital repayments, and maintenance costs. Each household will pay a monthly contribution of Euro0.70 per family member (Euro 4.20 per family of 6) to cover all on-going maintenance and capital repayment costs. The instalments may be tosome extent covered by savings on the social costs of colelcting fuel and water and by way of registration for Carbon Emission Reduction certificates under the Kyoto treaty.

i)The project encourages open competition and free enterprise within the framework of a cooperative and non-profit-making global financial structure.

j)Administration, construction and maintenance work will be done by local operators and villagers who will be paid mostly in local LETS currencies.

k)Local work will be paid for at current local pay rates expressed in the local LETS currencies.

l)The on-going administration costs of the Project Coordinator are specified in the project budget.

m)Users must make their first monthly contribution in advance, as project structures are put into use.

n)The tank commissions will be paid a small monthly allowance in formal currency, and receive an allowance in local LETS money for their work. The well commissions will be paid a monthly allowance under the local LETS currency for their work.

o)Individual women or women's groups will, without payment, each look after their own sanitation units.

p)Regular inspection of installations will be paid as necessary in the local LETS currency.

q)The operation of the local bank (The Mvolo Cooperative Local Development Bank) to be set up may be supported and supervised by a international Green Bank to be named.

r)The Mvolo County Council, the Government of Southern Sudan have undertaken not to intervene to impede the development of the local LETS currency either during or after the project period.

s)The Project Coordinator will reach a specific agreement with the ( applicable tax authorities) before the start of the project as to taxation of activities under the Local Exchange Trading (LETS) system.

t)Before the project starts, a formal agreement will be made to ensure ownership of the project is vested in the beneficiary communities, suject to formal handing over when the final instalment of the interest-free seed loan is repaid.

u)The local people design, execute, install, run, maintain, own and pay for all project structures.

v)All products and services supplied by the local people for the project will be paid under the local money system. Those supplying products or goods for the project before the local money system is set up will be paid from the project funds in formal currency.

04. PRINCIPLES BEHIND THE PROJECT

The basic principles behind the project are:

a)The enhancement of self-sufficiency in the local Yeri economy.

b)Existing social traditions will not suffer.

c)Local expertise, labour and materials will be used.

d)Women will play an active role in the project.

e)The people of the Yeri area must be able and willing to take full responsibility for all goods and services provided under the project and for its administration.

f)The users must contribute financially to loan repayments, cover on-going costs and accept the powers of the elected tank- and well commissions.

g)With the exception of the tranche for the eradication of onchocerciasis, the project will be self-funding. Savings on the social costs for collecting water and wood for cooking and services will compensate most of the project costs.

h)The supply of traditional natural fertiliser for agricultural purposes will not be compromised.

i)Each individual user will be enabled to meet his financial commitments to the project.

Household difficulties in meeting monthly quotas can be cushioned either from the monthly formal money allowances received by the tank commissions, or by creating a simple LETS system safety net. Members temporarily in difficulty could be allowed to run up a larger than usual local money debit balance. Members permanently in difficulty could perform services within the LETS group in exchange for group payment of their outstanding debts.

j)'Small is beautiful'. Small decentralized systems are to be preferred wherever possible. This promotes close contact of the people of Yeri with the installation and running of their own local infrastructure.

k) The local LETS currency will complement the use of formal money. It will make up for the lack of formal money that would otherwise be needed to expand the quantity of local goods and services. Economic development within the LETS system will also stimulate growth in the formal economy and increase its formal tax base.

l)The seed loan capital will be systematically recycled to users as interest-free micro-credits for productivity development. The micro-credits will allow goods and services that cannot be locally produced to be bought with formal currency outside the project area.

m)Leakage of formal currency out of the project area will be reduced. Seed capital will be retained and repeatedly recycled in the local area during the 10 year interest-free loan period.

05.LONG TERM GOALS OF THE PROJECT

The long term goals of the project are:

a)To sustain on-going improvement of the general quality of life wellbeing and health of the local people.

b)To free more human resources for local production and development.

c)To eradicate onchocerciasis in Mvolo County and reduce water-borne diseases in the project area so that medical staff and financial resources can be re-directed to other health objectives such as vaccination programmes and preventive medicine.

d)To decrease infant mortality and promote family planning.

e)To increase literacy levels.

f)To avoid future dependency on fuels imported from outside the project area.

g)To help reduce global deforestation and global warming.

h)To create value added from locally recycled wastes.

i)To create a "maintenance culture" to conserve the investments made.

j)To increase the local pool of expertise so that local people can improve their sustainable well-being and development by identifying and solving problems, including erosion, with a minimum of outside help.

k)To create full employment in the project area.

l)To integrate the disabled and blind into the local society.

06.INSTITUTIONAL STRUCTURES

The parties are involved in the project:
The local NGO "SIDF Sudan Inland Development Foundation", Mvolo, Southern Sudan (see 2.6.01)
The project coordinator (Yowani Ngoli) (See 2.6.02)
The consultant Terry Manning (see 2.6.03)
The Organisational Workshops (see 2.6.04)
External support agency administrator(s) (see 2.6.05)
The Mvolo county commissioner (or government of South Sudan) (see 2.6.06)
County secretary for re-habilitation and relief (see 2.6.07)
The Yeri Payam administrator (see 2.6.08)
The health department (see 2.6.09)
The education departmenrt (see 2.6.10)
The Local Tax Authorities (see 2.6.11)
The Mvolo Local Cooperative Development Bank (to be formed) (see 2.6.12)
The External Bank (Barclays ???) (see 2.6.13)
The Local Beosite Production Units (see 2.6.14)
The Tank Commissions - the Key Structures (see 2.6.15)
The Well Commissions (see 2.6.16)
Zimbabwe AHEAD (NGO) (see 2.6.17)
EOS Consult (see 2.6.18)
Medical Commissions (see 2.6.19)
Teachers' Commissions (see 2.6.20)
The independent auditors (see 2.6.21)

The details of the roles of each of the above and how they all interact with one another are set out in detail in section 2.6 of the project and in the diagrams and charts part of the project documents.


07. Short indicative budget main project

ItemOutgo (Capital)PhaseEstimate (Euro)
01OW health clubs230.000
02Formation of health clubs210.000
03Material for health clubs25.000
04Training of health workers210.000
05OW health courses in schools2pro-memoria
06Material for school courses2pro-memoria
07OW social structures240.000
08OW LETS system260.000
09Office and equipment LETS systems230.000
10OW Micro-credit system220.000
11Office/equipment Micro-credit system210.000
12OW Beosite production units230.000
13Shovel/preparation anhydrite supply site 2/310.000
14Construction and equipping anhydrite factory (*20000 FOR EACH FACTORY) ASSUMING 3 UNITS2/360.000
15Moulds for anhydrite products (*20000 FOR EACH FACTORY) ASSUMING 3 UNITS2/360.000
16Location gypsum depots and quality control23.000
17OW recycling system220.000
18Setting up recycling centre network350.000
19Setting up compost collection network35.000
20OW Bio-mass system315.000
21OW Drinking water system2/325.000
22Setting up of project workplace232.000
23Project transport2100.000
24Vehicles and materials for wells3150.000
25Fuel and maintenance vehicles326.000
26Drilling/lining costs3200.000
27Labour for wells - (excluding work under LETS systems) 330.000
2836 Washing places- LETS systems3pro-memoria
2936 Platforms for handpumps - (excluding work under LETS systems)320.000
30200 Solar Pumps 3200.000
31200 Supports for solar panels350.000
32Solar panels (60.4 kW)3360.000
33Handpumps groups (106 pumps)380.000
34Cables, feedpipe for pumps/wells398.000
35Pipe lines from wells to tanks - 100000m @ Euro 0.65365.000
36Labour for laying water pipelines- LETS3pro-memoria
37200 Water tanks (@ 2m * 1.7m)- mostly LETS350.000
38200 Bases for water tanks - mostly LETS320.000
39Supervision of installation and training maintenance operators315.000
40Purchase spare parts supplies320.000
41Permits and formalities21.000
42Preparation and formulation of project specifications26.000
4350 Solar water purification installations for clinics and schools312.500
44Solar water purification installations (inc.5.000 Wp panels)438.500
45200 PV lighting units for study purposes4200.000
46PV television for study4pro-memoria
4710 PV lighting systems for schools/evening classes440.000
48PV lighting for clinics outside the project area4pro-memoria
49PV lighting for clinics inside the project area440.000
50PV refrigeration for clinics @ Euro 10000/clinic -excluding onchocerciasis programme430.000
51Water testing equipment45.000
52Transport costs Euro to Mombasa2/330.000
53Transport costs internal to Yeri2/350.000
54Administration and supervision at Yeri3/436.000
55Fee Project coordinator @Euro 50000/year1/5100.000
56General project consulting Manning @Euro 50000/year1/5100.000
57Fund for PV lighting solar home systems480.000
58Sanitation facilities with exception of some additvites will be manufactured and installed within the local LETS systems3/415.000
59OW radio network425.000
60Fund for radio network4100.000
61Reserves 16.63% of total5582.000
62General total main project53.500.000


08.SHORT ANALYSIS MAIN PROJECT

Outgo (Capital)PhaseEstimate (Euro)
Total first phase10
Total second phase2524.500
Total phase 331.609.500
Total phase 44584.000
Fees project coordinator1/5100.000
Total supervision Manning1/5100.000
General total all phases 2.918.000
Reserves 16.63%5582.000
Total 1+2+3+4+5 3.500.000

ON-GOING COSTS MAIN PROJECT

On-going costsEuro
  
Coordinator for administration10.000
Maintenance operators5.000
Tank commissions (200*5 Euro p.m.)12.000
Spare parts15.000
Reserve for theft15.000
Unforeseen (about 15%)10.000
Total recurrent costs67.000

INCOME

IncomeEuro
  
Annual contribution for use of services (45000 people @ Euro 0.70 p.m.)378.000
On-gong costs per year67.000
Net annual income for loan repayment311.000

Comments

1. The above net income should be just sufficient to finance and repay an interest free loan for Euro 3.500.000 over a period of 10 years, taking the various reserves into account.
2. Interest-free loans for Beosite (R) factories each factory Euro 40.000, are subject to repayment over a period of 3-5 years, and are to be taken into account when calculating the fund available on repayment.
3. Funds for radio network and solar home systems etc are also subject to repayment, and are to be taken into account when calculating the fund available on repayment.
4. At the end of the ten years' period, on repayment of loan, large capital reserves will be built up for use in Micro-credits and, subsequently, for the extension and renewal of the capital goods.
5. Payments for water facilities for schools and clinics are included in the users' monthly contributions.
6. Payments and financing for eventual PV lighting and refrigeration facilities in clinics within the project area are covered in the users' contributions. Those for clinics and schools outside the project area partly serving users within the project area to be discussed.
7. Payments for PV lighting installations for study purposes will be financed by each tank commission area separately.
8. Savings on the purchasing of bio-mass for cooking and the costs of drinking water will at least partly offset the costs of the project.

09.Short indicative budget onchocerciasis eradication programme

ItemOutgo (Capital)Phase Annual amount (Euro)Estimate 15 years(Euro)
     
 Onchocerciasis eradication programme6  
63Spraying with helicopter along Naam River unknown per hour (with pilot) @ 6pro-memoriapro-memoria
64Insecticides for spraying unknown kg at unknown price 6pro-memotiapro-memoria
65Bacillus Thuringiensis istaelensis BTI initiative unknown6pro-memoriapro-memoria
6657 wells @ Euro 10006 57.000
6795 handpumps @ Euro 5006 47.500
6857 platforms @ Euro 5006 38.500
6960 operators @US 900 per year6 60.000900.000
7060 bicycles @ Euro 1006 6.000
71Toyota Landcruiser6 38.000
72Driver for Toyota690013.500
73Fuel maintenance vehicle per year65.25078.750
74Solar powered radio systems 20 @ 25006 50.000
75Radio licence fees 20 @ Euro250 p.a.65.00075.000
 Sub-total  1.294.250
 Reserve 13.72 %  205.750
 Total  1.500.000

Comments

1.Items 63, 64 and 65 have been entered pro-memoria pending further study.
2. Item 75 is subject to negotiation with the South Sudanese government.

10.GRAPHS FORMING AN INTEGRAL PART OF THE PROJECT DOCUMENT

GRAPH SHOWING DEVELOPMENT OF MICRO-LOANS
CASH FLOW DIAGRAM
THE INTEREST-FREE LOAN CYCLE
HOW THE ORIGINAL SEED LOAN MONEY IS USED
TYPICAL PROJECT EXPENDITURE BY QUARTER - budget items 01-30
TYPICAL PROJECT EXPENDITURE BY QUARTER - budget items 31-60
DETAILED EXPENDITURE FIRST QUARTER
DETAILED EXPENDITURE SECOND QUARTER
DETAILED EXPENDITURE THIRD QUARTER
DETAILED EXPENDITURE FOURTH QUARTER
DETAILED EXPENDITURE FIFTH QUARTER
DETAILED EXPENDITURE SIXTH QUARTER
DETAILED EXPENDITURE SEVENTH QUARTER
DETAILED EXPENDITURE EIGHTH QUARTER
DETAILED EXPENDITURE NINTH QUARTER
DETAILED FINAL EXPENDITURE

11.RECYCLING OF FUNDS FOR MICRO-LOANS

GRAPH SHOWING DEVELOPMENT OF MICRO-LOANS
THE INTEREST-FREE LOAN CYCLE
HOW THE ORIGINAL SEED LOAN MONEY IS USED

The funds recycled are approximately 16.430.000 Euro. They are made up of:

a) Repayments of the interest-free seed loan itself. These are shown as horizontal lines at the bottom of the micro-loans graph. They are constant. During quarters 42-45 the amounts left for repayment UNDER THE PROJECT are reduced to zero. However users continue to make monthly contributions on their own account, so the recycling of funds will in practice continue. The capital fund will build up again as shown in the micro-loans graph. It will drop again when replacements of the original capital goods are made or the system services extended. It will then build up for a third time to cover further collective capital investments and so on for so long as the users continue making their monthly contributions.

b) Certain capital sums (eg repayments for the Beosite (R) factories) and unused reserves.

c) Repayments under the micro-loans. These are seen as diagonal lines in the micro-loans graph. Towards the end of the project period, payback times are shortened to ensure capital re-enters in time for repayment of the original seed loan.


12. LIST OF KEY WORDS

Anhydrite use of, Banks role of in development, Beosite (R) products, Bio-mass for cooking, Briquettes bio-mass, Capacitation workshops, Chain control integral, Clodomir Santos de Morais, CO2 emissions reduction of, Communication flows in development projects, Compost recycling, Composting toilets, Cookers high efficiency, Cooperation role in development, Development projects structures for, Development sustainable, Drinking water supply, Economy developing countries, Economy development projects, Economy foreign aid, Economy industrial development, Economy interest-free development, Economy Local Exchange Trading (LETS) systems, Economy nominal local currencies development of, Economy micro credits, Economy self-financed development, Economy taxation and development, Education hygiene, Gender role of women, Gypsum cheap, Hand pumps, Health Clubs development projects, Hygiene education, Industrial development, Information flow in development projects, Integral chain control, Integrated development projects, Interest role of, LETS systems, Loans interest-free, Local currency systems, Local Exchange Trading (LETS) systems, Micro-credit systems, Morais Clodomir Santos de, Mvolo County development Yeri district, Organizational workshops (OW), Photovoltaic (PV) home systems, Photovoltaic (PV) lighting, Photovoltaic (PV) pumps, Photovoltaic (PV) refrigeration, Poverty alleviation, Products regeneration of, Pumps solar, Pumps hand, Rainwater harvesting, Recycling compost, Recycling shops, Recycling waste, Regeneration of products, Rural water supply, Sanitation developing countries, Sanitation dry, Self-financing development projets, solar pumps submersible, Stoves high efficiency, Sudan development Yeri, Sustainable development, Tanks Beosite (R) local manufacture, Toilet facilities Beosite (R), Toilets dry, Urine disposal, Washing places, Waste collection systems, Water purification UV, Water supply projects, Water supply rural, Water tanks Beosite (R), Women role of in development, Workshops Moraisian, Yeri development Sudan


13. ACCESS TO THE COMPLETE PROJECT

The project has been placed in the pubic domain and can be freely accessed and downloaded together with drawings, charts and graphs in colour together from the home page of the website : www.flowman.nl

RETURN TO MAIN PROJECT DOCUMENT


"Money is not the key that opens the gates of the market but the bolt that bars them"

Gesell, Silvio The Natural Economic Order

Revised english edition, Peter Owen, London 1958, page 228